Monday, 12 November 2012

Black Friday

Just for the record: Not a lot happened on Thursday. It was, of course, lectures but a very small handful of us volunteered to come to the Shed super early and chop down the forest (continuing with the metaphor from my last entry). This involved us meeting at 8.30am with the plan to be finished in time to get to lectures at 10am. We managed it and the tubes were stacked on shelves in alphabetical order by the time we left ready to be worked on that evening after lectures had finished . . . . . 

That didn't happen.

Third year were using the room and we would have to wait at least an hour before we could get in there, by which time there would hardly be any point in us starting varnishing. So we all got a well needed early night.

Onto Friday!

Nothing seemed to be going right on Friday. Despite planning on a really early start, it was a slow one as we were moved from place to place due to the spaces being used for teaching. 

Once we had finally settled, SamSam were off to the workshop to CNC the frame. The pieced that had been CNC-ed were then bought back for us to chisel out the circles (which seem to be taking over EVERYWHERE now!) and sand the frames down ready for coating. Sheel and Taniya were sent, once again, to B&Q to pick up said wood varnish.

Progress was also made on the inserts and over lunch, I heading over to the workshop with some 120 off-cuts to get them sanded for the craft fair. 

Whilst all this was going on, it had begun to rain so we had to quickly get all the still-slightly-wet tubes in before sending Sheel and Taniya to swap the wood varnish because it wasn't actually waterproof (???) 

Filing and sanding on the frames continued for the duration of the day but Clara (who would be coming with me to the craft fair) and I managed to escape and decorate some of the beautifully sanded off-cuts. 

By the time Sheel and Taniya got back to the Shed, it was closing time. However, Siobhan had managed to get the Shed open over the weekend for us to continue, but Shhhhh, it's a secret!


Icky Sticky Stuff . . .

This week has been all about the tubes
Apologises for the very late entry; we have all been so busy with the pavilion. Wednesday morning started with gluing the remainder of the tubes so that we could start varnishing that afternoon. Work went well and we were done soon after lunch so they could be left to dry.


Long days + solvent = crazy students
Meanwhile, Alex and Jamie were on the hunt for varnish. Jamie was enquiring about sponsorship from one of the suppliers but to no avail - the manager was in China. Darn. However, we managed to find a supplier in Manchester and Siobhan was able to go and collect that mid-afternoon. 

We were told that the CNC machine would be free that afternoon so Joe was working against the clock to finalise the CAD drawings to make them suitable for cutting. He and Oli were up at the CAM suite to get that sorted.

I managed to confirm the craft fair on Saturday and to build up funds, Taniya and I planned to sell cards and decorated off cuts at our hall's bar that evening.

 While we were waiting for the glue to dry, the priority was to get the back room reclaimed and ready to varnish in. This involved people clearing tables away, laying down paper and, probably most importantly, opening the large doors at the back.

Nearly there!
Our Tube Forest


















We started getting ready to varnish at 4pm and we were done by 6pm. We actually finished quicker than we thought although the back room turned into an eerie – and smelly – tube forest. Donning latex gloves and some rather fetching bin bags protected our clothes and we kept the massive doors open to aerate the room slightly – thanks to Jen for making us take a 10 minute fresh air break before we got too high on the fumes.

While most went home as soon as we had finished, the few of us who stayed behind to clear up chilled out with Siobhan outside the fume-filled room and ate Subway while the room aerated for a couple of hours before the Shed closed for the night. 







Wednesday, 7 November 2012

All hands on deck

Some of us became very attached to our tubes. . .
Once again, another early start for the Tube Cubed team. The plan was to meet at 8:45 and start the cutting of the tubes. Joe had made a list of the lengths needed so once we had sorted them into the rows and made individual cutting lists. We had three teams up and sawing and were finished soon after lunch time.
As all the tubes were all different we had to measure each diameter individually. This was recorded on the cutting sheets which were kept and Joe was able to make the appropriate adjustments to the drawing of the frame. 
We weren't going to let the guys have all
the fun!
Teamwork was crucial


















Once cut, the tubes were labelled with the grid reference according to our drawing and the ends sanded down to give a clean finish to them.

Organising the tubes into their rows was fun. A lot of them were already pretty much together as they were cut by the same teams but we needed to group them together and separate them before we could start gluing.


Someone order plywood?
Whilst we were busy in the Shed, Taniya and Sheel headed down to B&Q to pick up some glue and brushes. Warren, our white van man stole Sam and Panicos to help him collect the 13 sheets of plywood we need for the frame. I was also able to get into contact with the rubber suppliers and ordered the sheet we needed. It was meant to be ready for today. Yesterday afternoon I got an e-mail saying it was ready so Warren, Alex and I headed up to Cheetham to pick it up, making a stop at B&Q to pick up more PVA and buckets on the way back.
We were then able to FINALLY start coating the tubes with watered down PVA as a waterproof  base coat for the varnish - which should be happening today.
Gluing Tubes
Tubes, tubes, everywhere





Monday, 5 November 2012

Not so Hot

As the title suggests, today hasn't really gone to plan.

The tubes were coated over the weekend and we had a good look at them this morning. We began looking into sourcing varnishes but heard from our head of year that we may be able to get someone to donate them so we are currently waiting to hear back about that before we order anything.


The road trip became behind schedule very quickly. The plan was to leave at 9.30 this morning but there was a mix up with the keys or something so they weren't on the road until about 11.30. They did however let us know how it was going.

The Tube Pirates with the plunder
Things then went from bad to worse. We have had no response from the e-mails we sent out so we have to assume that we won't get anywhere with our sponsorship scheme. We began then to start considering fundraising and looking else where for sponsorship. The biggest idea we had for a fundraiser was a people auction where we would auction group members off to the highest bidder for the day. 

Later on in the day we came up with a plan for the off-cuts from the frames. After using the CNC machines, we would be left with a large amount of 100mm diameter circles of plywood. Just big enough for an image. Out of sheer luck, I heard about a craft fair being held this weekend in Prestwich so the idea is that we decorate the circles with illustrations, paintings, drawings, what ever we feel like and sell them as coasters or just images/decorations at the fair. This of course will all depend on when we get the frames cut, how many we can make and how quickly we can make them.
We also got into contact with family and friends who may know of companies etc that would possibly sponsor us.

After spending the best part of seven hours in the library, we headed over to the Shed to meet our well-travelled team mates and their cargo. When I say the van was full, I mean it was full! Despite it being cold and dark, I think we kind of enjoyed getting all the tubes out of the van and into the Shed where they are now sat in the corner waiting to be cut'n'coated.


Told you it was full!

Human conveyor belts at their finest.

Floating heads.

Backed up on the conveyor belt

Keeping the tubes in the corner was a
challenge - it involved moving lots of tables around.

Finally all in place.
Unfortunately, the Shed closed soon after 6pm so we couldn't make a start on the cut'n'coat tonight but we are all getting in nice an early tomorrow to make a really good start - and hopefully finish. There was nothing else to do except go home and watch the fireworks!

Waterproofing test of tubes



Another early start in the library for Tube CubedAfter hours of hard work the tube team managed to test the waterproofing for the coated tubes. Coating of varnishes will help the cardboard tubes repel water and will stain the pavilion with a nice earthy brown, fitting right in with the beautiful gardens of Dunham Massey. A little experiment has been done with three one-meter cardboard tubes which were treated with different varnishes and different PVA base applications. Three qualities were tested:
1. Type of varnish (outdoor vs. yacht)
2. Number of layers of varnish
3. PVA base quality (diluted or not)



From the results of the experiment, both outdoor and yacht varnish worked well on waterproofing and gave the same result. Water flowed down the tubes and did not soak into the cardboard. Water formed droplets and slid off the tubes. The number of layers of varnish and PVA didn't affect the waterproofing much in this test. It is, however, important to know that more layers of varnish tend to darken the tubes. We may need to coat the ends of the tubes with more layers in order to protect the weakest points. 







Of Road Trips and E-mails

Friday saw the group spending all day in the library. The big event of the day was probably getting the sponsorship pack sent off to about 260 local architects. 
The brochure was nearly ready Friday morning but we made some tweaks to it - aligning the text etc. The brochure was finally ready after lunch so we tried to send it. They bounced. All 260 e-mails. This called for drastic action so three of us took it in turns to send e-mails individually from the account. That didn't work either. In the end, Jamie was able to send the e-mails via his university account, with minimum bounce back. We are now awaiting replies . . .
Trying - and failing - to send the e-mails
Tomorrow, some of the group are going on a road trip to pick up our tubes. We are hoping that they will be back by around 3pm so we can make a start on the waterproofing. Two of the group were going to look at different coatings over the weekend and have a go at testing them. They were researching on Friday. 

With regards to the framework, we had an e-mail confirming that the costs of the workshop would be covered by the school so that is one less cost to worry about.

There have been a couple of minor changes to the structure. This is just to make it more sturdy and involve using off-cuts to create cross-bracing within the pavilion. This is being looked into by Joe with Oli's team also helping to source the plywood and the materials needed to put it all together. They also worked out how many CNC hours we will need to cut out the frame: about 2 hours a sheet and we have 13 sheets. Not only that but it will be a fight to the death to get to it as there are 4 other groups who also need to use it. 

We are meeting at the library again today so I will update you on all the goings on later!


Friday, 2 November 2012

A slightly late up-date

Today is day three of the project, which means the blog is well overdue an update!
So, Wednesday, we meet early once again and the first thing we did was a little re-shuffle of the group. Jennifer, project leader appointed leaders for the individual teams and a communications secretary (Me!). This meant that while she was running around like a headless chicken between the different teams working out exactly what was going on, she could leave the leaders to sort out the teams and report back to her. My job is to run around after her recording everything from minutes to meetings to reports to the blog.


Our 'benevolent dictator' talking structures

Probably one of the biggest achievements of the day was sourcing the tubes. We had our tube team on the phones all day and, despite several wrong answers, we managed to source all of the tubes we needed. We were also left with a decision to make: what size tubes to have. The original design was 150 mm but we couldn't get hold of any so we had to chose between 100 mm and 200 mm. In the end, we opted for 100 mm tubes which means we have to go and pick up 218 cardboard tubes. Fun times!
It was then left to the tube team to find a van to travel to various placed within a two hour radius to pick them up. This is to happen on Monday after a route is planned and our tubes are 110% confirmed. 

The tube team weren't the only ones to be busy. Publicity also had some amazing progress along with a genius of an idea that was the brain-child of James (team leader of publicity). We have come up with a sponsorship scheme where we will offer packages of Gold, Silver and Bronze to local architects and companies. Each package has different perks, with Gold being the most advantageous with regards to advertising their services. A brochure was produced for this last night and will be sent out today. 


It was all busy in the publicity office

We were also able to organise a meeting with Tom Jefferies, head of Manchester School of Architecture, to try and reduce the costs of using CAM in the workshop as we felt that what we wanted to do was seriously disproportionate to the cost. We are hoping to send him a spreadsheet of all the costings so that he can help us further.

Today, we are hoping to plan road trips, contact architects and get this design finalised with the new tube sizes. It's all good on the home front!