Guys . . . I don't think this is right . . . |
The morning started with with bolting the frames together and sorting the tubes ready for insertion. After the back frame was complete, we tested the tubes and I don't know about the rest of the group but I was pleasantly surprised to see that there weren't too many that didn't fit. We made a note of the ones not playing fair with the intention of sorting them out later.
The original plan was to get it up before lunch but as with even the best laid plans, it was not to be. So after a quick lunch break, we split into the teams for the build. The stop watch was started and it was all systems are GO!
First up was the bases. These were lined up by using one of the frames and once we were happy, they added the other two. The cross bracing between frames came next and then it was time for the human conveyor belt to make another appearance.
And then it was up! Just like that.
Nearly there! |
This. Tube. Will. Fit. |
That afternoon we were on such a high from actually building it, not very much seemed to get done. However there was the issue of the pavilion having a wobble. A big wobble. This is currently under scrutiny and a plan is being thought up to sort it out. Something along the lines of tensioning cable or metal rods diagonally down the sides of the pavilion.
No comments:
Post a Comment