This week has been all about the tubes |
Long days + solvent = crazy students |
We were told that the CNC machine would be free that afternoon so Joe was working against the clock to finalise the CAD drawings to make them suitable for cutting. He and Oli were up at the CAM suite to get that sorted.
I managed to confirm the craft fair on Saturday and to build up funds, Taniya and I planned to sell cards and decorated off cuts at our hall's bar that evening.
While we were waiting for the glue to dry, the priority was to get the back room reclaimed and ready to varnish in. This involved people clearing tables away, laying down paper and, probably most importantly, opening the large doors at the back.
Nearly there! |
Our Tube Forest |
We started getting ready to varnish at 4pm and we were done by 6pm. We actually finished quicker than we thought although the back room turned into an eerie – and smelly – tube forest. Donning latex gloves and some rather fetching bin bags protected our clothes and we kept the massive doors open to aerate the room slightly – thanks to Jen for making us take a 10 minute fresh air break before we got too high on the fumes.
While most went home as soon as we had finished, the few of us who stayed behind to clear up chilled out with Siobhan outside the fume-filled room and ate Subway while the room aerated for a couple of hours before the Shed closed for the night.
No comments:
Post a Comment