We planned the day so that we took shifts between working on the pavilion and working on our portfolios.
SamSam headed straight over to the workshop with Joe to finished CNC-ing the frame. This was then bought to the small team of us in the wood-workshop to be chiseled, filed and sanded to within an inch of it's life. This would then be ready to varnish.
The CNC machine in action |
Lunch time came with a shift change so while I spent the afternoon catching up on some blog entries and portfolio, other team members were slaving away to finish the varnishing and the inserts.
As we had finished varnishing the inserts on Sunday, they could then be fitted properly by pinning strips of rubber/scrap lino flooring around the edges. This was so that they wouldn't fall out of the tubes.
By the end of the day we were nearly ready for the test build.
No comments:
Post a Comment